Skip to content
Open 24/7 for emergenciesCall 24/7 · 07861 933265
Call 07861 933265WhatsApp us

Bathroom Installation in London

A finished bathroom: the bath with its wall-mounted spout, the shower hose and a wall-hung basin

One team, one price, one set of dates that don’t move.

Strip-out, first fix, tiling, second fix and making good, so you’re not chasing four trades and hoping they arrive in the right order.

Bathroom installation in London: what the price includes

  • Design and survey. Measured survey at your property, a drawn layout, and a written specification of every fitting before you commit.
  • Strip-out and disposal. Old suite out, waste away, licensed-carrier note provided.
  • First fix and electrics. Hot, cold and waste run to the new layout; lighting, shaver points and extraction by our Part P electrician.
  • Tiling and waterproofing. Tanking to wet areas, boarding, tiling, grouting.
  • Second fix and handover. Suite, brassware and shower fitted, tested, signed off, then plastering, decorating and a proper clean.

Local conditions we work around

Two London constraints shape a bathroom quote before any tiles are chosen. First, hard water: every fitting with a moving part, thermostatic cartridges, shower valves, fill valves, has a shorter life here, so we specify for serviceability rather than fitting whatever is cheapest and returning in three years. Second, the building: in a flat, moving a soil connection or running new pipework usually needs freeholder consent and sometimes conservation-area consideration, which is established at survey rather than discovered mid-strip-out.

Part of our bathrooms service: see also bathroom refurbishment and renovation and bathroom repairs and fault finding.

Questions people ask

How much does a bathroom installation cost in London?

A new bathroom is quoted as one fixed price after a free survey, and 10% comes off an installation we quote when you mention our bathroom offer before the survey. Repairs and small jobs stay at £110 for the first hour and £45 per half hour, plus parts.

How long does it take?

A straight swap is 5–7 working days; a full refit with moved pipework 2–3 weeks. We agree the dates with you before starting, and if they ever have to move we tell you why.

Can I supply my own suite?

Yes, and we'll check what you've chosen actually fits the space and the pipework before you pay for it. That check has saved a lot of people a lot of money.

What about the guarantee?

Twelve months on our workmanship plus the manufacturer warranties on fittings. One number to call if anything niggles, the same one you called first.

Call 07861 933265WhatsApp